Except for a ship lift, the dam project was completed and fully functional as of July 4, 2012, when the last of the main water turbines in the underground plant began production. Each main water turbine has a capacity of 700 MW. The dam body was completed in 2006. Coupling the dam`s 32 main turbines with two smaller generators (50 MW each) to pow....